I have started work more on the base now as I feel the prop is done for now. I have a deadline of finishing the outside of the windmill by the 29th of this month, will upload screenshots over the next few days of the work I have done.

So by the 29th I need the following too be done too an acceptable degree:

The outside shaft, plus the Wind Mill Props Blades.

The Base
- The Tent
- Doorway and Door
- Sign outside

The Tower
- The rooms (with windows)
- Random Metal Parts

The Top
- Hold in the building for the shaft too go into
- The roof

After finishing theses, I will then be working on the inside with other members from my team and be doing work else where.